Pool Renovation in Palm Beach and Broward County
A pool renovation is a full remodel of the pool itself: the finish, the tile, the coping, the steps and benches, the lighting and often the way the equipment is set up. The goal is to keep what is still good and replace what is tired, so you are not paying twice.

Who this is for
Renovation fits the owner whose pool works but looks dated, or whose pool has several worn parts at once. The finish is rough, the tile is faded or scaled, the coping is loose and the steps are awkward. Fixing each one in a different year means draining the pool several times and paying for access every time.
It also suits anyone who bought a house with an older pool and wants it to match how the family uses it today. A deep, narrow shape may need a sun shelf for kids or lounging. Steps may need a bench. Old lighting may be out of date or failing.
We start by walking the pool and asking how you use it. Then we work out what to keep. Not everything needs replacing, and we will say so. If your main problem is the surface alone, Pool Resurfacing is the narrower job. If the deck is part of the picture, look at Pool + Deck Makeover.
Options, honestly compared
Finish
Plaster, quartz or pebble. The finish sets the water color and the feel underfoot. Pebble costs more up front and is generally tougher. White plaster costs less and is gentler to maintain around. Your choice also depends on whether the pool is saltwater.
Tile and coping
Waterline tile and the coping on top of the beam. These are the most visible parts, and they affect how the pool feels as part of the yard. Glass mosaic and natural stone cost more than basic porcelain. Poured concrete coping costs differently from stone or pavers. See Tile & Coping for the detail.
Steps, benches and sun shelf
Changing the shape is possible where the structure allows it. Adding a bench or sun shelf, reshaping entry steps or removing an unused feature changes the shell, so cost depends on what is under the existing surface and on engineering and permit needs.
Lighting and equipment
LED lighting can replace failing fixtures while the pool is open. Equipment is usually handled by coordinating with a licensed equipment or electrical trade, not by us guessing. Where equipment work is needed, we line it up with the schedule so the pool is not drained twice.
How the work runs
Walk the pool and talk through use
We look at the shell, the tile, the coping, the equipment area and the deck. We ask what annoys you and what you would not change.
Decide what to keep
Sound tile may stay. Good equipment may stay. We separate what is cosmetic from what is failing, and tell you which items can wait.
Scope, permits and HOA
We write down the scope and confirm what permit and HOA steps apply. Those depend on the city, the community and whether the structure or electrical work changes.
Sequence the work
Demolition, shell repair, tile, coping, lighting, finish and fill are planned in a logical order. The finish goes in last so it is not damaged.
Finish, start up and hand over
After the finish, we fill, balance and walk you through start-up and care. You see the pool before we call it done.



Deciding what to keep
The cheapest renovation is the one that avoids replacing sound parts. A good pump or a still-sound shell should not be thrown away just because the pool is being redone. But old tile with hollow spots or a finish that has let go of the shell is not worth keeping, because it will fail under new work.
We also look at what the pool will face next. If the deck is going to be replaced soon, coping and deck should be planned together so the joint between them is done once.
Coordinating equipment and lighting
A renovation is a good time to look at the equipment pad, because the pool is empty and access is easy. Pumps, heaters, salt cells and automation are often handled by specialist trades. Where a licensed trade is needed, the work is coordinated with them rather than improvised.
Lighting is the same. Older fixtures can leak or fail, and replacing them while the pool is open is easier than doing it later. Electrical work has its own permit and inspection requirements, and those depend on the jurisdiction and scope.
Timing in a hurricane-season climate
From summer through fall, a drained pool and an open work site need a plan for storms. Ground water, heavy rain and wind all affect schedule and risk. We discuss the season before booking and tell you if a window is poor. Waiting a few weeks is sometimes cheaper than fixing storm damage.
Where we do pool renovation
Pool Renovation across Palm Beach and Broward County. Each city page covers local things worth checking before work starts.
- Pool Renovation in Boca Raton
- Pool Renovation in Delray Beach
- Pool Renovation in Boynton Beach
- Pool Renovation in Deerfield Beach
- Pool Renovation in Pompano Beach
- Pool Renovation in Fort Lauderdale
Read before you decide
Send photos of the pool and the deck. The quote lists every line.
Get a quotePool Renovation: questions
What is the difference between resurfacing and renovation?
Resurfacing replaces the interior finish. Renovation is the whole remodel: finish, tile, coping, shape changes, lighting and equipment coordination.
Can you change the shape of my pool?
Some changes, like adding a bench or a sun shelf, are possible depending on the shell. Anything structural may need engineering and permits, which we confirm for your address.
How long does a renovation take?
It depends on scope, weather, inspections and material lead times. A finish-only job is shorter than a full remodel. We give a realistic schedule once we have seen the pool, and we do not promise dates we cannot control.
Will I have to keep the pool empty the whole time?
Usually the pool is drained for the main work, then filled after the finish. How long it stays empty depends on scope and conditions.
Do I need HOA approval?
Often an HOA wants to review changes to color, materials or the footprint. Requirements depend on the community. We help you gather what they ask for.
Can I do the pool now and the deck later?
Yes, but you may redo the pool-to-deck joint twice. If a deck project is likely within a few years, planning it with the pool can save rework.
Often done together
Get a quote for pool renovation.
Tell us what you want done to the pool, the deck, or both. Photos of the pool, the deck and the equipment pad help us understand the job before we come out.
- You send the basics. Name, phone, address and what you want changed. Photos are optional.
- We look and get back to you. We review what you sent and contact you to set up a visit.
- You get a written quote. It lists the scope, the materials and colors, what comes out, and the order the work happens in.